Production process
How we work at RMB
0. OPERATING CYCLE
RMB manages the entire operational cycle behind the recovery of industrial and special waste...
1. CRUSHING
RMB’s waste volume reduction plants separate metals from light fractions such as rubber...
2. SELECTION AND SCREENING
Our facilities allow the separation of metals from inert/sterile materials. The physical...
3. FLOTATION AND WASHING
In this plant, the incoming material is separated based on its specific weight, using...
4. SEPARATION OF ALLOYS
Our latest-generation system allows different types of metal alloy to be separated based on...
5. WASHING
This unit improves the quality of the materials leaving the plant by removing any pollutants...
6. BOTTOM ASH RECOVERY
Systems for the recovery of bottom ash, equipped with screens, magnetic separators, sorting...
7. BOUND AGGREGATES
The facility processes materials from internal processing lines and/or third-party crushing...
8. FINISHED GOODS WAREHOUSE
Materials recovered from processing, classified as EoW, are stored by type in special boxes...
9. SORTING LABORATORY
Various types of materials are processed in the laboratory. Quality control personnel collect...
The plants are designed and optimised by the design team of the internal Technical Office, according to production needs and the materials processed by the company.